We Ship Worldwide! | FREE SHIPPING! for US Continental orders over $145. Click for details.

INSTRUCTIONS

Dimensions, loads, fastener sizes and spacing, deck strength, mounting and inspection for the 3280 and 3281 jib sheet fairleads.

DocumentHarken Grand Prix Jib Leads Instructions
FormatPDF · 2 pages · 0.4 MB
LanguageEnglish
Grand Prix Jib Leads

Specifications

Part no. Description Fastener spacing Length Width Height Max line Ø MWL Breaking load
3280 Midrange jib lead 2 3/16" (55 mm) 2 15/16" (75 mm) 7/8" (22 mm) 1 7/16" (37 mm) 1/2" (12 mm) 680 kg (1500 lb) 1360 kg (3000 lb) View part →
3281 Big boat jib lead 3 3/4" (96 mm) 4 15/16" (125 mm) 1 1/8" (29 mm) 2 5/16" (58 mm) 7/8" (22 mm) 1930 kg (4250 lb) 3860 kg (8500 lb) View part →

6061-T6 Hard Lube-anodized aluminium. Hobble holes take a short pendant to hold the jib or genoa clew temporarily and free a winch for mark roundings or sail changes.

Fasteners and Mounting

Part no. Hex head Socket head cap screw Cheese / fillister head C – spacing
3280 6 mm 1/4" / 6 mm 6 mm 2.165" (55 mm)
3281 7/16" / 10 mm 7/16" / 10 mm 10 mm 3.78" (96 mm)

Fastener Choice

  • Through-deck with access from below: hex head, socket head cap screw, cheese head or fillister head.
  • Tapped holes with no access from below: socket head cap screw, cheese head or fillister head.
  • Hex heads allow one-person mounting: the head is held by the sides of the inset.
  • On the 3280 only 6 mm hex-head bolts fit.

Mounting

  • Mount on a flat area of deck, reinforced if necessary to take a load equal to the breaking load of the fairlead.
  • Marine epoxy and G10 suppliers are good sources of deck reinforcement techniques; if in doubt, consult the builder.
  • Drill carefully and slightly bevel the top of each hole so the sealant forms a small ring at deck level.
  • Fill the hole and bevel with marine sealant and use every fastener hole.
  • Fasteners in A4 (316) or A2 (18-8) stainless, with large washers or backing plates and locknuts under deck.

Failure to ensure the correct deck strength can result in the fairleads pulling off the deck suddenly and unexpectedly under high load.

Inspection and Maintenance

  • Carefully inspect fairleads and mounting hardware for loosening, cracks or damage.
  • Clean by frequent flushing with fresh water.
  • Teak cleaners and caustic solutions can discolour the part; not covered by the warranty.

Parts in this Manual We Carry

Harken part numbers as printed in the instructions, matched to the genuine parts in our store.

Need a part that isn't listed? Ask us to source it and quote the part number from the PDF.

Products in this Manual