INSTALLATION MANUAL

Performance data, gipsy and chain match, cable sizing, above/below-deck installation, operation, maintenance, troubleshooting and the full parts list for the Lofrans Ercole vertical windlass, with its deck template.

DocumentLofrans Ercole Vertical Windlass Installation & User's Manual
FormatPDF · 47 pages · 5.6 MB
LanguageEnglish
Lofrans Ercole Vertical Windlass — Installation & User's Manual

Technical Data

3500 W 4000 W 5000 W 5500 W 7500 W 11CC (hydraulic)
Vessel length, heavy duty 85–110 ft 60–80 ft 70–85 ft 70–85 ft 90–145 ft 70–85 ft
Vessel length, light duty 100–115 ft 65–85 ft 75–90 ft 75–90 ft 145–155 ft 75–90 ft
Power supply 24 V 230 V / 400 V 230 V / 400 V 230 V / 400 V 400 V Hydraulic
Maximum linear pull 4500 kg
9900 lb
5500 kg
12100 lb
6000 kg
13200 lb
6500 kg
14300 lb
7500 kg
16534 lb
6500 kg
14300 lb
Maximum lift load 2250 kg
4950 lb
2750 kg
6050 lb
3000 kg
6600 lb
3250 kg
7150 lb
3750 kg
8267 lb
3250 kg
7150 lb
Max lift working load 1075 kg
2365 lb
1310 kg
2882 lb
1430 kg
3146 lb
1550 kg
3410 lb
2000 kg
4409 lb
1550 kg
3410 lb
Current at working load 120 A N/A N/A N/A 20–25 A N/A
Max line speed 15 m/min
45 ft/min
12 m/min
36 ft/min
12 m/min
36 ft/min
12 m/min
36 ft/min
12 m/min
36 ft/min
12 m/min
36 ft/min
Line speed at working load 8 m/min
24 ft/min
12 m/min
36 ft/min
12 m/min
36 ft/min
12 m/min
36 ft/min
12 m/min
36 ft/min
12 m/min
36 ft/min
Net weight with drum 180 kg
396 lb
185 kg
407 lb
198 kg
436 lb
198 kg
436 lb
225 kg
496 lb
160 kg
352 lb
Hydraulic pressure / flow N/A N/A N/A N/A N/A Min 170 – Max 200 bar
Min 35 – Max 40 l/min
Gipsy Chain supported
12 mm 12 mm ISO; 13 DIN 766; 7/16" G4
13 DIN 764 13 DIN 764
14 mm 14 mm, pitch 42 mm
16 mm 16 mm ISO
16 DIN 766 16 mm DIN 766
18 mm 18 mm ISO
18 DIN 766 18 mm DIN 766
12,5 12,5 stud link
14,5 14,5 stud link
16 16 stud link
17,5 17,5 stud link

Rope: not supported (N/A on every gipsy). The 4000, 5000 and 5500 W A.C. motors come in 230 V and 400 V with the same figures.

Electrical System

Model Motor (W) Voltage (V) Contactor (A) Cable 15–25 m Cable 50–75 ft Cable > 25 m Cable > 75 ft
Ercole Verticale 3500 24 250 70 mm² 2/0 AWG 95 mm² 3/0 AWG

Cable lengths are the total run, positive plus negative.

  • Control box (solenoids): in a dry place near the windlass.
  • Circuit breakers: use the Lofrans breakers, chosen for their trip curve rather than a plain rating.
  • Remote control panel: where the operator can see the windlass during the manoeuvre (deck, helm or cockpit), sealed so the terminals stay dry.
  • The wiring diagrams are in the PDF.

Requirements

  • In the box: windlass with motor/gearbox, remote control switch or reverser box, drilling template, handle, screws.
  • Tools: drill, 15 mm bit for wood and steel, 65 mm hole saw, 10 mm, 13 mm and 17 mm hex keys.
  • Align the windlass precisely with the bow roller.
  • Bow roller height must keep the chain inclination below 5 degrees.
  • The deck faces must be parallel; shim the difference if they are not.
  • With all the chain stowed, leave at least 300 mm between the underside of the deck and the top of the heaped chain.
  • Deck: solid enough for the anchor recovery loads. The M14 studs allow a deck thickness of 150 mm; other thicknesses on request.
  • Aluminium boats: insulate the windlass from the deck with a non-conductive gasket (not supplied), and insulate anchor and chain from the hull, including chain stopper and fixings.

Fitting

  • The windlass separates into an upper part (base, gipsy, drum) on deck and a lower part (gearbox and motor) below deck, joined by the studs.
  • With the emergency lever unscrew the wheel; remove drum and spring; remove screws and chain stripper; remove the gipsy, the Belleville springs and the inner clutch disc; unscrew the studs and lift off the base.
  • Fit the lower part below deck, join it to the base and reassemble.
  • Correctly installed, there is about 5 mm between gipsy and base. If more, add spacers to suit the deck thickness.
  • Run silicone around the base to keep water out; wire the motor per the diagram.
  • Use calibrated chain matching the gipsy. Feed the chain through the hole and make it fast, wrap it on the gipsy, then motor it in, keeping it aligned. Always fit a swivel between chain and anchor.
  • Deck template: print at 100% (1:1) and check it before cutting. It shows the four stud holes, the shaft hole and the chain-pipe cut-out; check the chain-pipe position for your configuration (as printed).

Operation

Lowering

  • Electrically: clutch tight, brake off, chain stoppers off; switch on the safety switch and press DOWN; then switch off and re-engage the stoppers.
  • By gravity: clutch tight, stopper and brake off, then ease the clutch with the handle. Clockwise brakes the chain (to a full stop), anticlockwise lets it run. Make the chain fast to a strong point.
  • A fully released clutch drops the anchor at high speed and can damage the hood and bow roller: control the speed.
  • Wait for the windlass to stop before reversing direction.

Recovery, Override and Drum

  • Breaker on, clutch tight, brake off, handle removed, stoppers off; press UP until the anchor seats in the bow roller; breaker off and chain on the stopper.
  • Do not recover on the batteries alone: run the engine or generator.
  • If the hydraulic-magnetic breaker trips on overload, reset it and wait some minutes before running again. It does not protect the motor from overheating on long runs.
  • Manual override: clutch engaged, brake and stoppers off, handle in the hand-wheel, turn clockwise against the reducer spring.
  • Warping drum: brake on and anchor secured; put the handle in the drum and turn clockwise to release the clutch (drum now independent of the gipsy); three turns clockwise, tail the rope and press UP; make the line fast on a bollard afterwards.
  • Never use the windlass as a mooring point; hold the load on a chain stopper or strong point, and never put chain on the warping drum.
  • Pay out so the chain lies on the seabed without heaping; motor slowly up over the anchor to ease recovery; slow down as the anchor reaches the bow roller.

Maintenance Programme

Use of the yacht Less than 2 months From 2 up to 6 More than 6 Charter
Every 3 months A – B A – B
Every 6 months A – B
Every 12 months A – B – C C C C – D
Every 24 months D D E
Every 36 months D – E E E
  • A – Rinse all external surfaces and hidden points with fresh water and remove all salt.
  • B – Grease the rotating parts, especially the main shaft threads and clutch cones; check for corrosion and mechanical stress.
  • C – Check the motor terminals and test the voltage drop at the terminals.
  • D – Replace all gaskets.
  • E – Remove the windlass from the deck, clean the salt from under the base and re-seal.

Gipsy Service

  • Unscrew the wheel with the emergency lever; remove drum and spring.
  • Remove the screws and the chain stripper; take off the gipsy, the Belleville springs and the inner clutch disc.
  • Wash with running water, never a pressure washer, and check for corrosion or stress.
  • Reassemble in reverse order, greasing threads and moving parts.

Disconnect power before any maintenance. Skipping the programme voids the warranty. The English gipsy-service steps 1–4 are printed in French in the manual (as printed); the steps above follow that text.

Troubleshooting

Problem Possible causes Solution
Windlass does not run when a control is operated Protection switch OFF; no voltage; control box, control or motor failure Switch ON; check battery charge and connections; check/replace control box or control; measure motor voltage, if OK clean the brushes, otherwise replace the motor
Chain jams frequently Locker not deep enough for the chain carried; chain does not suit the gipsy; chain not calibrated Fit the windlass over the deepest point of the locker or carry less chain; change the gipsy; replace chain that is out of tolerance
Windlass turns slowly Cable section too small; deck faces not parallel; bad connections; dirty brushes; water in the motor Increase cable section; shim the faces parallel; check connections; clean brushes; replace the motor
Motor runs, shaft does not turn UP or DOWN Worn or broken wormwheel/worm teeth; broken motor spindle (Service) remove the windlass, replace the broken parts and check no fragments got into the oil circuit; replace the motor and check no broken piece is left in the worm bore. Replace gaskets, screws, keys, circlips and oil at the same time
Motor runs, shaft turns UP but not DOWN The emergency mechanism engages: tangled chain in the locker, poor chain (burrs, zinc), chain stowed in a block, worn emergency spring, or stripper fouling the gipsy Fit a swivel joint after the anchor; inspect and free the chain link by link; lower all the chain in deep water and recover it with the windlass; (service) replace the spring; reposition or replace the stripper. The emergency mechanism can be locked (gears always engaged) only with the owner's authorisation: this removes the emergency function
Motor runs but the drum will not warp Drum used the wrong way, so the emergency mechanism engages Warp with the main shaft turning in the same direction as the gipsy when it recovers chain
Motor and shaft run, gipsy stays still with the brake band loose Gipsy not closed on the clutch cones; clutch or gipsy cones deformed Check clutch tightening, measure for deformation, shim if needed and replace damaged parts; replace the clutch and/or gipsy
Shaft runs out of line with the gipsy and/or drum Shaft bent by excessive load Check the windlass is used within its specification; (service) replace the shaft plus worn parts, gaskets, circlips, keys and oil
Oil leak between motor and gearbox Loose motor coupling makes the worm run irregularly and the seal leaks (Service) find why the fixings loosened, check the spindle and worm bore for ovality and repair on the bench; check for oil in the motor; replace gaskets, keys, circlips, screws, oil and worn parts
Shaft and studs too short for the gearbox at installation Wrong deck thickness given when ordering If the keyed shaft engages the gearbox along its full length, adapt the studs; otherwise order a longer shaft
Runs slowly and sometimes trips the breaker Cable section, connections, brushes, water in the motor, faces not parallel, oil loss, motor labouring, or works in one direction only Increase cable section; check connections; clean brushes; replace the motor; restore parallel faces; (service) inspect gearbox and motor; check 12/24 V across B2–C and B3–C on the control box with each button pressed, and replace the control box if a relay does not work

Spare Parts

Drawing B.14.102 Rev. E, 03-2007. Item numbers are drawing references; only the kits carry Lofrans codes.

Lofrans Ercole vertical windlass exploded view

Service Kits

Kit code Description
KA14101 Kit A – Seals Ask us to source it →
KB14101 Kit B – Screws & nuts Ask us to source it →
KC14101 Kit C – Keys Ask us to source it →
KD14101 Kit D – Circlips Ask us to source it →
KS14101 Kit S – Sensor & magnet Ask us to source it →

Parts

Item Description Kit
226 Washer for screw M8 Kit B
227 Nut – M8 Kit B
231 Washer for screw M5 Kit B
242a Cap nut – M8 Kit B
250 Hd cap screw – M5×8 Kit B
260 Spring washer for screw M8 Kit B
272 Handle –
293 Hd cap screw – M5×16 Kit B
351 Hd cap screw – M6×20 Kit B
381 Key – 8×7×40 Kit C
386 Spring washer for screw M10 Kit B
400 Circlip – 15 DIN 471 Kit D
401 Pivot Kit B
402 Hex hd screw – M6×16 Kit B
403 Spring –
412 O-ring seal – 153 Kit A
414 Hex hd screw – M8×30 Kit B
420 Hex hd screw – M10×25 Kit B
566 Handle –
567 Clutch nut –
568 Seal – 55×72×10 Kit A
569 Drum –
570 Spring –
571 Clutch cone – outer –
572 Circlip – 80 DIN 472 Kit D
573a Nylon band –
573b Nylon band –
574a Gipsy chain 10 –
574b Gipsy chain 12 –
574c Gipsy chain 1/2 HT –
574d Gipsy chain 14 –
574e Gipsy chain 16 –
574f Gipsy chain 16 DIN 766 –
574g Gipsy chain 1/2 stud link –
574h Gipsy chain 14 stud link –
574i Gipsy chain 13 Italmet –
574l Gipsy chain 13 DIN 764 –
574m Gipsy chain 16 stud link –
574n Gipsy chain 18 –
574o Gipsy chain 18 stud link –
574p Gipsy chain 19 stud link –
574s Gipsy chain 18 DIN 766 –
575 Band brake –
576 Pivot –
577 Spring –
578 Brake pivot –
579 Hand-wheel –
580 Washer for screw M12 Kit B
581 Safety nut – M12 Kit B
582 Dished plane spring –
583 Clutch cone – inner –
584 Base –
585 Brake pivot support –
586 Brake pivot –
587 Spacer –
588 Seal – 64×80×8 Kit A
589 Bearing – 6010 2RS –
590 Spacer –
592 Hex hd screw – M12×55 Kit B
593 Washer for screw M10 Kit B
598a Stud – M14×210 –
599a Gearcase – upper –
600 Nut – M14 Kit B
601 Washer for screw M14 Kit B
602 Bearing – 6014 2RS –
603 Circlip – 18 DIN 471 Kit D
604 Pivot –
605 Bush –
606 Gear –
607 Gear flange –
608 Key – 12×8×90 Kit C
609 Key – 12×8×60 Kit C
610 Rack –
611 Key – 16×10×60 Kit C
612b Main shaft, chain ≤ 16, deck thickness 150 –
612c Main shaft, chain ≥ 18, deck thickness 150 –
613 Circlip – 88 DIN 471 Kit D
614 Pivot –
615 Wormwheel – M=3.5/Z=47 –
617 Pawl –
618 Ratchet wheel –
619 Hd cap screw – M6×10 Kit B
620 Thrust ring – CP 5578 –
621 Thrust bearing – AX5578 –
622 Gasket –
623 Gearcase – lower –
624 Bearing – 6210 2RSR –
626 Sightglass –
631 Worm –
632a Thrust bearing – 51108 –
633 Spacer –
634 Seal – 40×72×10 Kit A
637 Key – 8×7×30 Kit C
640 Electric motor 3500 W 24 V –
641a Electric motor A.C. ph 1 V 220 kW 5 Hz 50/60 (as printed) –
641b Electric motor A.C. ph 3 V 380 kW 4 Hz 50/60 (as printed) –
642 Brake cover –
746 Stud – M8×55 Kit B
900a Stripper, gipsy 574 type c-e-f-g-l –
900b Stripper, gipsy 574 type b-d-h-m-n-o-p-s –
901 Roller –
902a Chain pipe std –
902b Chain pipe short –
994 Nylon band –
1030 Magnet Kit S
1100 Combined bearing – 30205A –
1103 Sightglass flange –
1160 Ratchet wheel – left –
1174 Set screw – M8×6 Kit B
1175 O-ring seal – 4325 Kit A
1189 Washer for screw M12 Kit B
1190 Sensor Kit S
1191 Sensor holder Kit S

Need a part that isn't listed? Ask us to source it and quote the part number from the PDF.

Products in this Manual