INSTALLATION MANUAL

Performance data, gipsy and chain match, cable sizing, installation, operation, maintenance, troubleshooting, dimensions and the parts list for the Lofrans X5 vertical windlass (3000W 24V DC, 3600W 230/400V AC and 9cc hydraulic), with the deck template.

DocumentLofrans X5 Vertical Windlass Installation & User's Manual
FormatPDF · 47 pages · 2.3 MB
LanguageEnglish
Lofrans X5 Vertical Windlass — Installation & User's Manual

Technical Data

3000W 3600W 9cc
Vessel length, heavy duty 85–95 ft (electric versions)
Vessel length, light duty 90–100 ft (electric versions)
Power supply 24V 230/400V N/A
Maximum linear load/pull 2800 kg
6160 lb
3000 kg
6600 lb
3000 kg
6600 lb
Maximum lift load 1400 kg
3080 lb
1500 kg
3300 lb
1500 kg
3300 lb
Max lift working load 760 kg
1672 lb
815 kg
1793 lb
815 kg
1793 lb
Amps at work load 250 A N/A N/A
Max line speed 30 m/min
90 ft/min
20 m/min
60 ft/min
20 m/min
60 ft/min
Line speed at working load 12 m/min
36 ft/min
20 m/min
60 ft/min
20 m/min
60 ft/min
Net weight with drum 100 kg
220 lb
105 kg
231 lb
105 kg
231 lb

The vessel-length rows span the 3000W and 3600W columns in the printed table. The technical data are printed as an image; values are copied from it.

Gipsy Chain supported
12 mm 12 mm ISO, 13 DIN 766, 7/16" G4
13 DIN 764 13 DIN 764
14 mm 14 mm ISO
1/2" HT 1/2" G4
1/2" BBB 1/2" BBB

Rope supported: N/A for all gipsies.

Electrical System

Motor (W) Voltage (V) Contactor (A) Cable 15–25 m / 50–75 ft Cable >25 m / >75 ft
3000 24 125 50 mm² / 2 AWG 75 mm² / 000 AWG

Cable length is the total run, positive plus negative.

  • Contactor (control box): mount in a dry place near the windlass.
  • Circuit breakers: use the Lofrans breakers, chosen for their trip curve and not just a plate rating.
  • Remote control panel: mount where the operator can see the windlass and seal it so the terminals stay dry.
  • The wiring diagram shows deck footswitches UP/DOWN, the solenoids and the motor terminals.

Before You Drill

  • In the box: windlass with motor/gearbox, remote control switch or reverser box, drilling template, handle, screws.
  • Tools: drill, 10 mm bit for wood and steel, 10 mm, 13 mm and 17 mm hex keys.
  • Align the windlass precisely with the bow roller; bow roller height must keep the chain inclination below 5 degrees.
  • The deck faces must be parallel; shim if they are not.
  • With all the chain stowed, leave at least 300 mm between the underside of the deck and the top of the heaped chain.
  • Deck thickness: 100 mm with the standard series studs (the dimension drawing gives min 60 – max 90 mm, as printed); other thicknesses on request.
  • Aluminium boats: insulate the windlass from the deck with a non-conductive gasket (not supplied), and insulate anchor, chain, chain stopper and fixings from the hull.

Deck and Under Deck

  1. Place the drilling template on deck, aligned with the bow.
  2. Mark and drill. Leave the hole edges sharp, but radius the forward edge of the chain hole at 45°.
  3. Set the upper part on deck. Seal with silicone, never a permanent adhesive.
  4. Below deck: grease the main shaft, join the gearbox with the motor away from the chain hole, fit washers and nuts on the studs and tighten.
  5. Connect the battery cables to the motor following the wiring diagram.

Loading the Chain

  1. Feed the chain through the hole and secure it to a safe point.
  2. Wrap the chain round the gipsy.
  3. Recover all the chain under power, checking it enters the gipsy aligned.

Use calibrated chain matching the gipsy and always fit a swivel between chain and anchor.

Operation

Lowering

  • Electrically: clutch tight, brake off, chain fixings off; switch on the safety switch and press DOWN; switch off and re-engage the fixings.
  • By gravity: clutch tight, stopper and brake off, then ease the clutch with the handle. Clockwise brakes the chain (to a full stop), anticlockwise lets it run. Then make the chain (or rope) fast to a strong point.
  • A fully released clutch drops the anchor at high speed and can damage the hood and bow roller: always control the speed.
  • Wait for the windlass to stop before reversing direction.

Recovery and Warping Drum

  • Breaker on, clutch tight, brake off, handle removed, stoppers off; press UP until the anchor seats in the bow roller, then breaker off and chain on the stopper.
  • Run the engine or generator while recovering. If the breaker trips on overload, reset it and wait some minutes; it does not protect the motor from overheating on long runs.
  • Warping drum: brake on and anchor secured; handle in the drum, turn clockwise to release the clutch (drum turns independently of the gipsy), three turns of rope clockwise, press UP; make the rope fast to a bollard afterwards.
  • Never put chain on the warping drum. Always remove the handle when not in use.

Never use the windlass as a mooring point: hold the load on a chain stopper or strong point.

Maintenance Programme

Use of the yacht (months) Less than 2 From 2 up to 6 More than 6 Charter
Every 3 months A – B A – B
Every 6 months A – B
Every 12 months A – B – C C C C – D
Every 24 months D D E
Every 36 months D – E E E
  • A – Clean all external surfaces and hidden points with fresh water to remove the salt.
  • B – Grease the rotating parts, especially the main shaft threads and clutch cones; check for corrosion and mechanical stress.
  • C – Check the motor terminals and test the voltage drop at the terminals.
  • D – Replace all gaskets.
  • E – Remove the windlass from the deck, clean the salt from under the base and re-seal.

Gipsy Service / Replacement

  1. Turn the gipsy hand-wheel anticlockwise with the handle to remove it.
  2. Slide the upper clutch cone, gipsy and lower clutch cone off the shaft.
  3. Wash with running water, never pressure-wash, and check for corrosion or mechanical stress.
  4. Reassemble in reverse order, greasing threads and all moving parts.

Disconnect power before any maintenance. Skipping the programme voids the warranty.

Troubleshooting

Problem Possible cause Solution
Windlass does not run when a control is operated Protection switch OFF; no voltage; control box, control or motor failure Set the switch ON; check battery charge and connections; check/replace the control box or control; measure motor voltage – if OK, check and clean the brushes, otherwise replace the motor
Chain jams frequently Locker too shallow for the chain carried; chain does not suit the gipsy; chain not calibrated Fit the windlass over the deepest point of the locker or carry less chain; change the gipsy; replace chain that is out of tolerance
Windlass turns slowly Cables too small; deck faces not parallel; bad connections; dirty brushes; water in the motor Increase cable section; shim the faces parallel; check connections; clean brushes; replace the motor
Motor runs, shaft turns neither up nor down Worn or broken wormwheel/worm teeth; broken motor spindle (Service) replace the broken parts, checking no debris has entered the oil; replace the motor, making sure no broken piece is left in the worm bore
Motor runs, shaft turns UP but not DOWN Tangled chain locker, poor chain, chain stowed in a block, worn spring of the emergency mechanism, or stripper fouling the gipsy – the emergency mechanism engages Fit a swivel after the anchor; inspect and free the chain; pay out all the chain in deep water and recover it; (service) replace the spring; re-centre or replace the stripper
Warping drum cannot be used Drum used in the wrong direction, so the emergency mechanism engages Warp with the main shaft turning in the same direction as when the gipsy recovers chain
Motor and shaft turn, gipsy stays still with the brake band loose Gipsy not clamped on the clutch cones, or the closing wheel at end of travel; deformed cones with the hubs touching Check clutch tightening, measure for deformation, then replace the clutch and/or gipsy
Shaft runs out of true Shaft bent by excessive load Check use is within the specification; (service) replace the shaft and worn parts, gaskets, circlips, keys and oil
Oil leak between motor and gearbox Loose motor coupling makes the worm run irregularly (Service) find why the fasteners loosened, check spindle and worm bore, repair on the bench, check for oil in the motor; replace seals and oil
Shaft and studs too short on installation Wrong deck thickness specified Adapt the studs if the key engages the gearbox over its full length; otherwise order a longer shaft
Runs slowly and sometimes trips the breaker Cables too small; poor connections; dirty brushes; water in the motor; deck faces not parallel; gearbox lost oil; motor strains; works in one direction only Increase cable section; check connections; clean brushes; replace the motor; shim the faces parallel; (service) inspect gearbox and motor; check for 12/24V between B2–C and B3–C on the control box when each button is pressed – if present and a relay does not work, replace the control box

Spare Parts

Lofrans X5 windlass exploded view

Item numbers refer to the exploded view (B.59.101). The kit letter shows which kit includes each part, as printed.

Item Description Kit
216 Nylon bush –
217 Hex hd screw M8×20 Kit B
226 Washer for screw M8 Kit B
231 Washer for screw M5 Kit B
234 Hd cap screw M8×20 Kit B
250 Hd cap screw M5×8 Kit B
255 Key 6×6×25 Kit C
260 Spring washer for screw M8 Kit B
272 Handle –
293 Hd cap screw M5×16 Kit B
336 Oil cap –
361 Seal 40×50×5 Kit A
395 Seal 50×70×10 Kit A
396 Bearing 16010 –
400 Circlip 15 DIN 471 Kit D
407 Sightglass –
414 Hex hd screw M8×30 Kit B
415 Nut M12 Kit B
449 Pivot –
453 Bearing 6206 –
567 Clutch nut –
568 Seal 55×72×10 Kit A
575 Band brake Kit B
576 Pivot Kit C
577 Spring Kit D
580 Washer for screw Kit B
581 Safety nut M12 Kit B
582 Dished plane spring –
583 Clutch cone – inner –
585 Brake pivot support –
586 Brake pivot –
609 Key 12×8×60 –
642 Brake cover –
671 Bearing 6011 –
730 Conic screw M10×30 Kit B
741 Key 12×8×150 –
746 Stud M8×40 Kit B
874 Gearcase – upper –
875 O-ring seal 4800 Kit A
877 Ratchet –
878 Gearcase – lower –
879 O-ring seal 159 Kit A
880 Oil level flange –
881 Coupling flange –
883 Spacer –
884 Handle –
1024 Spring –
1031 Sensor –
1174 Screw M8×6 Kit B
1256 Electric motor 3000W 24V –
1260 Wormwheel –
1261 Worm –
1262 Motor flange for B14 –
1263 Hd cap screw M12×30 Kit B
1264 Spacer –
1265 Base –
1266 Hand-wheel shaft –
1267 Gimbal –
1268 Brake shaft –
1269 Support; support sensor (two rows, as printed) –
1270 Hand-wheel –
1272 Drum –
1273 Clutch cone – outer –
1274 Chain pipe –
1275 Stripper –
1276 Stripper base –
1277 Seal 55×90×10 Kit A
1278 Spiral retaining ring 55mm Kit D
1279 Circlip 90 DIN 472 Kit D
1280 Main shaft –
1297 Stud M12×160 –
1313 Gipsy chain 12 ISO – 13 DIN 766 – 1/2" DIN 766 –
1323 Key 6×7×40 Kit C
574d Gipsy chain 14 ISO –
574g Gipsy chain 12,5 stud link –
632b Bearing 51108 –
641ai A.C. electric motor 4KW B14 –

Overall Dimensions & Deck Template

Ref. mm
A 385
B (deck) min 60 – max 90
C 200
D Ø132
E –
F 332
G 140
H 445
I 264
J Ø152
K 339
L 190

Letters refer to the dimension drawing C.59.101 (X5 3000W) in the manual.

  • Deck template (separate download): base cut-out with four Ø16 stud holes, Ø60 shaft hole, chain pipe cut-out and the chain-line offset A for 12.5 stud link, 14.5 stud link and 14 short link chain.
  • Lofrans warns the drawing may not be to scale once printed: print at 100% and verify the printed dimensions before you start the installation.

Need a part that isn't listed? Ask us to source it and quote the part number from the PDF.