Fit the panel in the wheelhouse. The full connection diagram is in the PDF download.
Using the Panel
Switch on the main switch.
Press the on/off switch twice: after the first press the LED flashes green and the buzzer sounds continuously; press again within 6 seconds. The LED stays green and the buzzer confirms the panel is ready.
Operate the windlass motor with the direction switch.
After use press the on/off switch once; the panel sounds a signal. It also switches off automatically 30 minutes after the last use of a direction switch.
Switch off the main switch when leaving the ship.
If two control panels are installed, never operate the windlass from both panels at the same time.
Protection
Thermal protection of the control current: on overload the panel sounds a warning once and the LED lights red and green alternately for about 7 seconds.
Once the overload is solved the system works normally again.
Need a part that isn't listed? Ask us to source it and quote the part number from the PDF.