Luff tension, line routing, operation, sail fitting, maintenance and dismantling for the Selden RB Mk II / RC Mk II furling mast in sections F217, F234 and F252.

The System
Manual for the Selden RB Mk II and RC Mk II furling mast in mast sections F217, F234 and F252. The asymmetric luff extrusion bends more easily, reducing initial resistance to reefing. Cables run in soft cable conduits. The whole reefing mechanism can be removed for service; all screws go into stainless thread inserts.
- Masthead / inside the mast: top swivel, halyard swivel, sail feeder, extra sheave box for a furling jib halyard, topping lift (1:2).
- Gear: furling gear with line driver, kicker bracket, turning blocks, clew outhaul car and outhaul fairlead.
- Openings: access to sail feeder and halyard swivel, to tack hook and tensioning screw, access for greasing, opening for in-mast stowage of the halyard tail, cable exit.
Checking & Adjusting Luff Extrusion Tension
Tensioned at the factory. Before stepping, lay the mast horizontally: the extrusion should be just clear of the mast wall at its mid point. Once stepped, it should not contact the mast wall when you grasp it through the upper access hole and shake it.
- Remove the access covers (depress one button and push, lift the opposite end).
- Undo the lock retaining screw and free the locking tube.
- Push the locking tube up above the sail feeder and hold it there with a screwdriver through the hole at the lower end of the sail feeder; the screwdriver also stops the luff section turning.
- Lubricate the tensioning screw with rigging screw oil and turn the furling gear with the winch handle until the luff is correctly tensioned.
- Adjust so the locking tube fits over the lower part of the luff section, lower it to the locking position and refit the lock retaining screw.
Always release backstay tension before tensioning the luff. Do not over-tension: it increases furling effort.
Line Routing
- Furl with a reefing line plus an outhaul, from the cockpit or at the mast. Operating at the mast is recommended for type RC, because of friction in the control line system from mast to cockpit on a large yacht.
- From the cockpit: endless loop of ø10 mm polyester rope on a self-tailing winch, with extra length to take it off the winch; belay the tail on a stopper. Take caution if an electric winch is used.
- If the line must pass through blocks and stoppers, splice it endless afterwards per Selden instruction 595-673; with removable blocks/stoppers a pre-spliced endless line can be used.
- Outhaul: self-tailing winch and stopper recommended.
- Topping lift and kicker are best led to the cockpit on rope stoppers. End the topping lift with a figure-of-eight knot where it exits the boom, positioned to stop the boom dropping below its lowest necessary level (not needed with a rod kicker).
- One winch only is possible but more cumbersome. Because the endless line passes the same turning block both ways, chafe against the kicking strap mast attachment can add friction.
Unfurling & Furling
Unfurling (line driver set to "free" when working from the cockpit)
- Free both sides of the endless loop from winch and stopper.
- Pull the sail out with the outhaul.
Furling
- Keep the leech fairly tight with the vang or topping lift.
- Pull the starboard part of the endless line by hand or with a winch handle.
- Keep slight outhaul tension, especially with the wind abaft the beam or in light air.
- Always lock the furling gear when leaving the boat.
Reducing Sail
- Carefully slacken the outhaul.
- Keep easing the outhaul while rolling in the desired amount of sail.
- Keep the leech fairly tight.
- At the mast: set the gear lock to "RATCHET" before reefing, then stretch the foot with the outhaul.
- From the cockpit: make both sides of the reefing line fast so it cannot slip on the line driver, then tension the outhaul.
Never leave the handle in the line driver: it rotates very rapidly when the sail is unfurled. Lock the gear at the mast when reefing in heavy weather.
Fitting the Sail, Cables & Before Sailing
- Remove the covers.
- Attach the head of the sail to the halyard swivel.
- Attach the clew to the outhaul car.
- Hoist while making sure the sail feeds correctly into the luff extrusion.
- Join the tack to the tack hook.
- Tighten the halyard.
- Furl until only 200–300 mm of the clew is exposed, line driver turning clockwise.
- Sail made to Selden instruction 595-542 "Sailmakers guide".
- The sail must roll on the starboard side of the luff extrusion: pull the starboard part of the endless line so the line driver turns clockwise.
- Furl and unfurl a couple of times to check the system and sail size; keep the area aft of the mast free of halyards.
- Adding cables: pull a new cable through an existing soft conduit with a messenger line (pull a new messenger through with it), or put new cables and a new messenger in a new soft conduit hoisted in the front mast compartment.
Periodic Maintenance
At least once a year; rinse with fresh water more often to remove salt and sand. Grease bearings with Selden grease 312-501 (tube delivered with the mast), thin even coat only.
- Top swivel: grease into the hole marked "GREASE", through the sail slot.
- Halyard swivel: inject grease into the gaps in the ring through the upper access hole.
- Furling gear: remove the access cover, lift the rubber cover and grease the upper shaft bearing; through the cover level with the line driver grease the bevel gears and ball bearings; grease the line driver bearing through the hole inside the winch socket.
Removing the Gear
- Lay the mast horizontally on trestles.
- Slacken the tensioning screw.
- Remove the upper plastic plug; detach the luff extrusion from the gear through the grease hole by removing the lower split pin and clevis pin.
- Undo the eight holding screws and remove the gear (possible with the mast stepped).
- Undo the nuts on top, lift off the headbox and detach the top swivel.
- Pull the luff section and halyard swivel out of the mast.
Furling Gear
Tools: hammer, 6–8 mm (1/4–5/16") punch, 6 mm Allen key, small screwdriver, new spring pins. Do not reuse spring pins.
| Part No. | Description | |
|---|---|---|
| 166-857 | Spirol pin ø8x45 (2 needed) | Ask us to source it → |
| 166-528 | Spring pin ø6x40 (1 needed) | Ask us to source it → |
- Drive the spring pin out of the large bevel gear.
- Pull the shaft up and out; balls and ball races will fall apart.
- Drive the spring pin out of the small bevel gear and pull gear and bearings off the shaft.
- Undo the four screws and remove the line driver from its bracket. Clean bearings, races, gears and winch parts in solvent.
- Reassemble in reverse order. Grease the winch before reassembly; grease in the cupped half of a race holds the balls. Grease the bevel gear teeth.
Halyard Swivel
- Remove the shackle.
- Remove the retainer ring.
- Remove and clean the ball bearings and races.
- Bend in the two side snaps inside the swivel and push the sliding sleeve down to remove it.
- Reassemble in reverse order, using grease in the bearing rings to hold the balls.
Need a part that isn't listed? Ask us to source it and quote the part number from the PDF.
Products in this Manual
-

Selden Lubricating Grease (90 g) - for Furlex, Winches and Furling Masts
SELDEN-LUBRICATING-GREASE-TUBE-90-G
$20.99 USDUnit price /Unavailable -

Selden Rigging Screw Oil - 100 Ml
SELDEN-RIGGING-SCREW-OIL-100ML
$13.99 USDUnit price /Unavailable




