INSTRUCTIONS
Reassembling a Selden mast that was split for transport: riveted and screwed butt-strap joints, the joint sleeves of 321/171, 365/194, 324/169 and 370/192 sections, and rejoining the luff extrusion of an in-mast furling mast.
DocumentSelden Joined Masts Reassembly Instructions
FormatPDF · 1 page · 0.1 MB
LanguageEnglish

Reassembly of Spliced Masts (595-603-SE)
- Mast front up; check the halves are not turned and halyards not twisted. Clean the joint surfaces, tension halyards and cables, push together and support the mast straight at the joint.
- Screws not enclosed: rivet from the front, then aft, one side at a time. Sections with permanent screws: fit them first from the front, with locking adhesive, then rivet.
- Screws enclosed (threaded butt-strap holes): pull mast and butt strap together with the screws along the front line, rivet the adjoining holes, remove the screws, drill the holes ø 6,5mm and rivet; work aft one side at a time.
- Remove the rivet mandrels, check the sail groove (file the joint if needed so slides pass), refit the spinnaker pole track – fit all its rivets loosely first to check it is not upside down.
- Handle the splice with care; lift the mast with its front or aft side up.
321/171, 365/194, 324/169, 370/192 (595-735-E)
Screwdriver TORX # 40, tightening moment 19-21 Nm; locking adhesive (Loctite 639 or equivalent).
- Mast parts on cradles, front up; tie corresponding messenger lines together (tape the knots for long service).
- Fit the joint sleeves loosely to one half: four screws per sleeve, hand-tight.
- Push the halves together keeping messengers and cables tight; align the holes.
- Fit all screws with locking adhesive; tighten the four per sleeve, then the rest from the front line aft, one side at a time, completing each longitudinal row.
Older version (595-631-E)
- Sections 214x122, 232x126, 260x136: front rivet lines LK850 (countersunk), remaining forward butt strap LD850 (dome headed); aft butt straps MFX 6x10 (214x122, 232x126) or MFX 6x12 (260x136).
- Section 290x150: all screws – front lines MFX 6x16, remaining MFX 6x12; no riveting.
- Tools: phillips screwdriver, half round file, hammer, 2.5 mm mandrel, sailmaker's needle (plus rivet gun, drill and 6.5 mm bit for riveted sections).
Luff Extrusion (in-mast furling masts only)
- Mast port side up; slacken the messengers at the headbox approx. 200mm.
- Remove the four nuts on top of the masthead box; leave the box hanging in the messengers without twisting them.
- Take the top luff extrusion out of the sail compartment; pull out the lower one (tack hook end) until the joining sleeve just protrudes. Do not remove the halyard swivel.
- Push the two parts together with the sail grooves perfectly aligned; fit and pull the supplied rivets, remove mandrels, fit plastic plugs if supplied.
- Push the plastic cover of the top extrusion down to meet the lower one; push the assembly in until the end just protrudes and fit the top swivel.
- Refit the head box with the four L-bolts + nuts, marks on the headbox matching the mast lines.
- Fit the lower end to the furling gear shaft, split pin on the side opposite the tack hook, and tension the luff extrusion per the furling mast manual.
- Halyards: fit one at a time with a sailmaker's needle, untying only one messenger at a time.
Need a part that isn't listed? Ask us to source it and quote the part number from the PDF.






