INSTALLATION MANUAL

Drill sizes, deck-thickness limits and installation steps for the Seldén through deck lead (one-sided) and the three-part two-sided through deck lead.

DocumentSelden Through Deck Lead Installation Manual
FormatPDF · 2 pages · 0.5 MB
LanguageEnglish
Selden Through Deck Lead — Installation Manual

Through Deck Lead

Used with the supplied nut or without it, depending on deck thickness. Always glue the lead in; the nut helps hold it while the glue cures.

Part no. Hole øD (mm)
420-510-01 10
420-511-01 12
420-512-01 16
  1. Drill a hole in the deck per the table.
  2. Place the lead through the deck.
  3. Fit the nut if the lead protrudes through the deck.

Through Deck Lead, Two-Sided

Three-part design: two deck eyes screw into a distance tube that is cut to the deck thickness (grooves make a straight cut with a metal saw easy).

Part no. Hole øD (mm) Deck t min (mm) Deck t max (mm)
420-520-01 12 12 30
420-521-01 15 12 30
420-522-01 19 14 40
  1. Drill a hole in the deck per the table.
  2. Fit the upper eye to the tube.
  3. Place the lead in the deck.
  4. Mark the deck thickness on the tube.
  5. Cut the tube at the mark with a metal saw.
  6. Place lead and tube in the deck; the tube must not protrude on the outside.
  7. Fit the second lead into the tube.

All values read from the drawing tables; the PDF has no extractable text.

Need a part that isn't listed? Ask us to source it and quote the part number from the PDF.

Products in this Manual