INSTRUCTIONS

Fitting the Spinlock WL/1 and WL/2 furling line leads to 25 mm (1") stanchions, which one goes where, care and main dimensions.

DocumentSpinlock WL Line Lead Instructions
FormatPDF · 2 pages · 0.3 MB
LanguageEnglish
Spinlock WL Line Lead — Instructions

Installation – WL/1 and WL/2

  1. Positioning: place the WL block on the stanchion at the desired height.
  2. Use the WL/2 on the first and last stanchions and the WL/1 on the intermediate ones.
  3. Securing: both are supplied with fasteners for a straightforward bolt-on attachment to 25mm (1") diameter stanchions.
  4. Adjusting (WL/2): the tracker-ball angle adjuster lets you align the sheave with the entry and exit angles of the line.
  5. Final check: the block must be tight so it cannot slip, and the line must run freely without restriction.

Dimensions (mm)

Part no. Stanchion Height Clamp to sheave Width
WL/1 Ø25mm (1") 48 18 + 39 26 View part →
WL/2 Ø25mm (1") 60 23 + 57 24 View part →

Values from the instructions. The separate dimension sheets give 47 and 17.9 for the WL/1 and 58 for the WL/2 (as printed). The line drawings in the instructions are not to scale.

Maintenance

  • Rinse with fresh water to remove rope and salt build-up. Do not use cleaning products or lubricants – they can damage the product.
  • Inspect carefully for wear and damage.
Spare Description
WL sheave WL furling line lead replacement sheave View part →

Safety

  • Check the product is correctly specified for your application, load and line size, and that it is correctly installed before its first use under load.
  • Braided fibre rope only – never three-strand or wire rope. Never use the product if it is damaged or worn, or with damaged rope.
  • Never use cleaning or lubricating solvents, polysulphide or polyurethane based sealants: they degrade the product. Do not modify any part.

Need a part that isn't listed? Ask us to source it and quote the part number from the PDF.

Products in this Manual