INSTRUCTIONS
Harken reeving diagram for a 5:1 purchase with a right-angle lead: double block with becket, double block, and a single block on a swivel base leading to a cam cleat.
DocumentHarken 5:1 Right-Angle Reeving with Swivel Base Reeving Diagram
FormatPDF · 1 page · 0.2 MB
LanguageEnglish

5:1 Right-Angle Reeving with Swivel Base
- Blocks: a double with becket and a double, leading to a single on a swivel base.
- Follow the numbered arrows 1 to 5 in the diagram: the line starts at the becket, runs alternately through the sheaves of the two doubles (legs 1 to 4), then leg 5 leads down to the single block on the swivel base and turns at right angles to the cam cleat on the base arm.
The full-page diagram is in the PDF download; it shows the reeving sequence only. Choose block size and working load to suit your sheet loads.
Need a part that isn't listed? Ask us to source it and quote the part number from the PDF.






