INSTALLATION MANUAL

Performance data, gipsy and chain match, cable sizing, deck installation, operation, maintenance schedule, troubleshooting and the full parts lists (models A, B and C) for the Lofrans Super Ercole horizontal windlass, with its deck template.

DocumentLofrans Super Ercole Horizontal Windlass Installation & User's Manual
FormatPDF · 50 pages · 4.8 MB
LanguageEnglish
Lofrans Super Ercole Horizontal Windlass — Installation & User's Manual

This manual is split into 2 pages: Part 1 · Part 2 →

Technical Data

3500 W 4000 W 5500 W 11CC (hydraulic)
Vessel length, heavy duty 95–120 ft 100–125 ft 105–135 ft 105–135 ft
Vessel length, light duty 110–125 ft 115–130 ft 130–150 ft 130–150 ft
Power supply 24 V 230 V / 400 V 230 V / 400 V Hydraulic
Maximum linear pull 5000 kg
11000 lb
6000 kg
13200 lb
7000 kg
15400 lb
7000 kg
15400 lb
Maximum lift load 2780 kg
6116 lb
3000 kg
6600 lb
3500 kg
7700 lb
3500 kg
7700 lb
Max lift working load 870 kg
1914 lb
1430 kg
3146 lb
1670 kg
3674 lb
1670 kg
3674 lb
Current at working load 190 A N/A N/A N/A
Max line speed 15 m/min
45 ft/min
12 m/min
36 ft/min
12 m/min
36 ft/min
12 m/min
36 ft/min
Line speed at working load 8 m/min
24 ft/min
12 m/min
36 ft/min
12 m/min
36 ft/min
12 m/min
36 ft/min
Hydraulic pressure / flow N/A N/A N/A Min 170 – Max 200 bar
Min 35 – Max 40 l/min

Net weight with drum, electric models: model A 195 kg (429 lb), model B 235 kg (517 lb), model C 210 kg (462 lb). Hydraulic 11CC: model A 175 kg; in pounds model A 341 lb, model B 473 lb, model C 418 lb. The kilogram values for hydraulic models B and C are cut off in the table (as printed).

Gipsy Chain supported
12 mm 12 mm ISO; 13 DIN 766; 7/16" G4
13 DIN 764 13 DIN 764
14 mm 14 mm, pitch 42 mm
16 mm 16 mm ISO
16 DIN 766 16 mm DIN 766
18 mm 18 mm ISO
18 DIN 766 18 mm DIN 766
12,5 12,5 stud link
14,5 14,5 stud link
16 16 stud link
17,5 17,5 stud link

Rope: not supported (N/A on every gipsy).

Electrical System

Model Motor (W) Voltage (V) Contactor (A) Cable 15–25 m Cable 50–75 ft Cable > 25 m Cable > 75 ft
Super Ercole 3500 24 200 70 mm² 00 AWG 95 mm² 000 AWG

Cable lengths are the total run, positive plus negative.

  • Control box (solenoids): in a dry place near the windlass.
  • Circuit breakers: use the Lofrans breakers, chosen for their trip curve rather than a plain rating.
  • Remote control panel: where the operator can see the windlass during the manoeuvre (deck, helm or cockpit), sealed so the terminals stay dry.
  • The wiring diagrams are in the PDF.

Before You Drill

  • In the box: windlass with motor/gearbox, remote control switch or reverser box, drilling template, handle, screws.
  • Tools: drill, 10 mm bit for wood and steel, 10 mm, 13 mm and 17 mm hex keys.
  • Bow roller height must keep the chain inclination below 90 degrees.
  • The deck faces must be parallel; shim the difference if they are not.
  • With all the chain stowed, leave at least 300 mm between the underside of the deck and the top of the heaped chain.
  • Aluminium boats: insulate the windlass from the deck with a non-conductive gasket (not supplied), and insulate anchor and chain from the hull, including locker and fixings.

Deck Installation

  • Lay the drilling template on deck, aligned with the bow.
  • Mark and drill. Leave the hole edges sharp, but radius the forward edge of the chain holes at 45°.
  • Set the upper part of the windlass on deck.
  • Fit the chain stripper pipe so the stripper is aligned and 4–5 mm from the gipsy throat.
  • Run the battery leads to the motor through the openings in the gearbox body.
  • Seal the base to the deck with silicone.
  • Deck template: it warns it may not print to scale. Print at 100% and check the printed dimensions before cutting.

Operation

Lowering

  • Electrically: clutch tight, brake off, chain stoppers off; switch on the safety switch and press DOWN; then switch off and re-engage the stoppers.
  • By gravity: clutch tight, stopper and brake off, then ease the clutch with the handle. Clockwise brakes the chain (to a full stop), anticlockwise lets it run. Make the chain fast to a strong point.
  • A fully released clutch drops the anchor at high speed and can damage the hood and bow roller: control the speed.
  • Wait for the windlass to stop before reversing direction.

Recovery, Override and Drum

  • Breaker on, clutch tight, brake off, handle removed, stoppers off; press UP until the anchor seats in the bow roller; breaker off and chain on the stopper.
  • Run the engine or generator while recovering rather than relying on the batteries alone.
  • If the hydraulic-magnetic breaker trips on overload, reset it and wait some minutes before running again. It does not protect the motor from overheating on long runs.
  • Manual override: clutch engaged, brake and stoppers off, handle in the hand-wheel, turn clockwise against the reducer spring.
  • Warping drum: brake on and anchor secured, clutch off (drum turns independently of the gipsy), three turns clockwise, tail the rope and press UP; make the line fast on a bollard afterwards.
  • Never use the windlass as a mooring point; hold the load on a chain stopper or strong point, and never put chain on the warping drum.
  • Pay out so the chain lies on the seabed without heaping; bring the boat slowly up over the anchor to ease recovery; slow down as the anchor reaches the bow roller.

Maintenance Programme

Use of the yacht Less than 2 months From 2 up to 6 More than 6 Charter
Every 3 months A – B A – B
Every 6 months A – B
Every 12 months A – B – C C C C – D
Every 24 months D D E
Every 36 months D – E E E
  • A – Rinse all external surfaces and hidden points with fresh water and remove all salt.
  • B – Grease the rotating parts, especially the main shaft threads and clutch cones; check for corrosion and mechanical stress.
  • C – Check the motor terminals and test the voltage drop at the terminals.
  • D – Replace all gaskets.
  • E – Remove the windlass from the deck, clean the salt from under the base and re-seal.

Gipsy Service

  • Turn anticlockwise with the handle to remove the gipsy.
  • Slide off the upper clutch cone, gipsy and lower clutch cone.
  • Wash with running water, never a pressure washer, and check for corrosion or stress.
  • Reassemble in reverse order, greasing threads and moving parts.

Disconnect power before any maintenance. Skipping the programme voids the warranty.

Troubleshooting

Problem Possible causes Solution
Windlass does not run when a control is operated Protection switch OFF; no voltage; control box, control or motor failure Switch ON; check battery charge and connections; check/replace control box or control; measure motor voltage, if OK clean the brushes, otherwise replace the motor
Chain jams frequently Locker not deep enough for the chain carried; chain does not suit the gipsy; chain not calibrated Fit the windlass over the deepest point of the locker or carry less chain; change the gipsy; replace chain that is out of tolerance
Windlass turns slowly Cable section too small; deck faces not parallel; bad connections; dirty brushes; water in the motor Increase cable section; shim the faces parallel; check connections; clean brushes; replace the motor
Motor runs, shaft does not turn UP or DOWN Worn or broken wormwheel/worm teeth; broken motor spindle (Service) remove the windlass, replace the broken parts and check no fragments got into the oil circuit; replace the motor and check no broken piece is left in the worm bore. Replace gaskets, screws, keys, circlips and oil at the same time
Motor runs, shaft turns UP but not DOWN The emergency mechanism engages: tangled chain in the locker, poor chain (burrs, zinc), chain stowed in a block, worn emergency spring, or stripper fouling the gipsy Fit a swivel joint after the anchor; inspect and free the chain link by link; lower all the chain in deep water and recover it with the windlass; (service) replace the spring; reposition or replace the stripper. The emergency mechanism can be locked only with the owner's authorisation: this removes the emergency function
Motor runs but the drum will not warp Drum used the wrong way, so the emergency mechanism engages Warp with the main shaft turning in the same direction as the gipsy when it recovers chain
Motor and shaft run, gipsy stays still with the brake band loose Gipsy not closed on the clutch cones; clutch or gipsy cones deformed Check clutch tightening, measure for deformation, shim if needed and replace damaged parts; replace the clutch and/or gipsy
Shaft runs out of line with the gipsy and/or drum Shaft bent by excessive load Check the windlass is used within its specification; (service) replace the shaft plus worn parts, gaskets, circlips, keys and oil
Oil leak between motor and gearbox Loose motor coupling makes the worm run irregularly and the seal leaks (Service) find why the fixings loosened, check the spindle and worm bore for ovality and repair on the bench; check for oil in the motor; replace gaskets, keys, circlips, screws, oil and worn parts
Shaft and studs too short for the gearbox at installation Wrong deck thickness given when ordering If the keyed shaft engages the gearbox along its full length, adapt the studs; otherwise order a longer shaft
Runs slowly and sometimes trips the breaker Cable section, connections, brushes, water in the motor, faces not parallel, oil loss, motor labouring, or works in one direction only Increase cable section; check connections; clean brushes; replace the motor; restore parallel faces; (service) inspect gearbox and motor; check 12/24 V across B2–C and B3–C on the control box with each button pressed, and replace the control box if a relay does not work

Need a part that isn't listed? Ask us to source it and quote the part number from the PDF.