INSTALLATION MANUAL

Installation data for the Sleipner Side-Power SAC2200 AC electric tunnel thruster (730 mm tunnel): specifications, tunnel and motor dimensions, gear leg drilling, epoxy bracket filler, torques, coupling, oil filling and power supply.

DocumentSleipner SAC2200 AC Thruster Installation Manual
FormatPDF · 32 pages · 5.2 MB
LanguageEnglish
Sleipner SAC2200 AC Thruster — Installation Manual

Product Specifications

Item SAC2200/730-I SAC2200/730-C
Tunnel inside diameter 730 mm / 28,7" 730 mm / 28,7"
Thrust continuous / max. 2000 kg (4410 lbs) / 2200 kg (4850 lbs) 2200 kg (4850 lbs) / NA
Motor output 138 kW / 188 Hp 138 kW / 188 Hp
Supply, 3-phase 380-690 V (model specific) 380-690 V (model specific)
Motor IP 55 55
Current draw max. 400V / 690V 270 / 157 A 270 / 157 A
Generator load max. 165 kVA 165 kVA
Gear leg DNV type approved; gravity feed, on-water oil change DNV type approved; gravity feed, on-water oil change
  • Max thrust is available until the motor winding exceeds 130°C; current draw is the max set in the VFD; generator load is not the required generator capacity – indicatively plan 2 x the listed load with the generator supplier. Low harmonic drives (THD <5%) on request.
  • VFDs: ACS880-01-293A-3 (frame R8, 380-415 V) or ACS880-37-293A-5 (low harmonic, frame R11, 380-500 V) for 400V systems; ACS880-01-174A-7 (R8) or ACS880-37-174A-7 (R11) for 690 V.
  • No integrated galvanic separation (optional kit).

The specification table in the PDF heads both columns "SAC2200/730-I-4(L)-H(V)" (as printed); the second column has the -C data.

Tunnel and Motor Dimensions

Code Description SAC2200/730-I SAC2200/730-C
ID (min) Internal tunnel diameter, min. 730 mm 730 mm
T Tunnel thickness min. / max. 12 / 30 mm 12 / 30 mm
TL Tunnel length min. / recommended 1100 / 1500 mm 1100 / 1500 mm
WD Water depth recommended / min. 1400 / 1100 mm 1400 / 1100 mm
H Height (varies with tunnel OD) 1767 mm 1888 mm
W × L Motor width × length 567 × 762 mm 645 × 852 mm
(av) Gear centre to motor flange, vertical 999 mm 1029 mm
(ah) Gear centre to first mounting point, horizontal 1189 mm 1245 mm
(b) Gear centre to motor top 2145 mm 2266 mm
(x) Tunnel bracket length 902 mm 902 mm
Weight Assembly / motor 1342 / 890 kg 1602 / 1150 kg

Gear Leg and Bracket

  • Metal hulls: never mount without the Sleipner galvanic isolation kit.
  • Drill the centre hole first on the vessel centreline: ØA 160 mm, B 130 mm, ØC 26 mm, D 50 mm, ØE 37 mm (SAC/SH2200).
  • Sealant on both sides of the gasket; eye bolts in the propeller and motor shafts help lift the gear leg; support it on a wood block.
  • The gear leg carries a dot for the oil suction point: it must be at the lowest position (flip 180° in horizontal installs if needed).
  • Oil or grease the bracket O-rings, assemble with thread paste and tighten the gear leg to the motor bracket at 250Nm.
  • Fill the gap between motor bracket and tunnel with epoxy casting resin through the four filler ports until it shows at the two bleed ports (horizontal installs: the two lower ports, bleed from the upper); bleed and filler port screws 28Nm.

Propeller and Motor

  • Seat the propeller on the taper and check free rotation before locking. Fit one propeller until oil filling is done.
  • Parallel key up, approx. 1mm gap; grease only the thread. Lock nut to 500Nm without washer, remove, grease the washer face, refit to 500Nm and fold the tab washer. Anode bolts 30Nm; the plug on the gear leg housing 35Nm (from the drawing).
  • Protection cover pressed fully onto the shaft and parallel key in place before the coupling.
  • Motor on a rigid separate bedding (cardan angle within +/- 1.5 degrees), or supported on the motor flange in vertical installs.
  • Coupling size 140, axial and radial bolts M20x65 at 500Nm +/-5%, L 250, angular 0.15° each joint, radial 0.5mm. Radial bolts first, then axial, torque wrench only.

Motor bracket filler – required resin properties

Initial viscosity Pot life Tg max onset Tensile modulus Flexion modulus Compression yield Charpy resilience
<3000 mPa.s >1 h >60 °C >5000 N/mm² >4000 N/mm² >80 N/mm² >7 kJ/m²

Sleipner gives Sicomin SR CA 85 with SD8701 hardener as one example; post curing may be needed – follow the resin datasheet.

Oil Tank and Filling

  • Oil: Meropa EliteSyn XM 150, about 10l including the container.
  • Container above the waterline by at least 20% of the waterline-to-tunnel-centre distance; oil (feed) and bleed tubes to their nipples on the motor bracket, no loops.
  • Gravity feed: container valve open, fill valve closed, keep refilling the container (slow). Pressure feed: device on the fill valve (3/8" BSPP), container valve closed, never more than 1 bar. Finish with the fill valve closed and secured, the container valve open and secured.
  • Oil change: open the fill valve with the tank valve closed, remove the oil by vacuum on the fill valve, refill as above.

Control and Commissioning

  • VFD and power cabling by certified electricians, to the VFD manual, with shielded VFD motor cable.
  • PDC-301 proportional drive controller on S-Link: configured as bow thruster by default; first start with a VFD motor ID run in local mode, then Remote mode; optional PMS integration; thrust limited above 130°C winding temperature and motor stop above 150°C.

Need a part that isn't listed? Ask us to source it and quote the part number from the PDF.