INSTALLATION MANUAL

Specifications, actuator and Vector Fin dimensions, hull structural loads, hull cut-out and actuator bedding with filler injection, power and SCU wiring, reverse detection, keel alignment, fin fitting and set-up for Sleipner eVision electric stabilizers SPS40E, SPS50E, SPS60E and SPS70E.

DocumentSleipner eVision Stabilizers SPS40E, SPS50E, SPS60E, SPS70E Installation Manual
FormatPDF · 52 pages · 6.0 MB
LanguageEnglish
Sleipner eVision Stabilizers SPS40E, SPS50E, SPS60E, SPS70E — Installation Manual

Technical Specifications

Item SPS40E SPS50E SPS60E SPS70E
Supply voltage 24V: 17V–33V; 48V: 35V–65V 24V: 17V–33V; 48V: 35V–65V 24V: 17V–33V; 48V: 35V–65V 48V: 35V–65V
Power consumption, each actuator 3.6kW 3.6kW 5.5kW 7.4kW
Ambient temperature -25°C to +55°C -25°C to +55°C -25°C to +55°C -25°C to +55°C
A – actuator height outside the hull 15.8 mm / 0.6" 15.8 mm / 0.6" 16.8 mm / 0.7" 16.8 mm / 0.7"
B – total actuator height 219.6 mm / 8.6" 226.6 mm / 8.9" 289.8 mm / 11.4" 320.6 mm / 12.6"
C – actuator height inside the hull 169.6 mm / 6.7" 171.6 mm / 6.8" 229.8 mm / 9.0" 240.6 mm / 9.5"
ØE – actuator motor 290 mm / 11.4" 310 mm / 12.2" 350 mm / 13.8" 400 mm / 15.7"
ØF – actuator through the hull 340 mm / 13.4" 361 mm / 14.2" 407.5 mm / 16.0" 457.5 mm / 18.0"
ØG – actuator base plate 450 mm / 17.7" 471 mm / 18.5" 564 mm / 22.2" 614 mm / 24.2"
Weight 65 kg / 143.3 lbs 75 kg / 165.3 lbs 120 kg / 264.9 lbs TBD
Free space for motor replacement 100 mm / 3.9" 100 mm / 3.9" 165 mm / 6.5" 200 mm / 7.9"

Base plate tooling distance 50 mm and minimum 200 mm bend clearance for the 151713-xxx (SCU) cable around the actuator. SCU-12 (2-fin): 170 × 271 × 60 mm, mounting holes 153 × 247 mm; SCU-14 (4-fin): 170 × 289 × 96 mm, mounting holes 153 × 275 mm.

Vector Fin Actuator Max. speed A total length B length to centre C total height D width from centre E total width
V4-8 SPS40E ≤35 knots 1342 mm 1134 mm 652 mm 396 mm 471 mm
V3-9 SPS40E ≤23 knots 1433 mm 1220 mm 690 mm 426 mm 501 mm
V4-8HS SPS50E ≤40 knots 1342 mm 1134 mm 652 mm 396 mm 476 mm
V4-12 SPS50E ≤35 knots 1574 mm 1330 mm 764 mm 465 mm 543 mm
V3-14 SPS60E ≤23 knots 1751 mm 1490 mm 843 mm 520 mm 613 mm
V4-15 SPS60E ≤35 knots 1805 mm 1525 mm 876 mm 534 mm 627 mm
V4-12HS SPS60E ≤40 knots 1574 mm 1330 mm 764 mm 465 mm 558 mm

Fin Positioning & Hull Structural Forces

  • Fins must not extend outside the beam (including fenders) or below the keel/propeller in neutral, must stay submerged in normal roll, and should be as far outboard as possible and not in line with the propellers.
  • Close to the LCG (usually a little aft of 50% of waterline length); high-speed boats within the middle 1/4 of waterline length at speed and not ahead of the LCG; under 15 knots within the middle 1/4 of waterline length.
  • Keep at least 22 degrees of outboard stroke. Mechanical range 360°; operational range <90° outward and <45° inward, and the range can be limited to a segment.
  • Values are normalised; dimension the hull with a safety factor for wave impacts. Hull reinforcement must follow a naval architect's recommendations; isolate actuator noise near living areas.
Actuator / fin Speed (kn) Max bending moment (kNm) Mx (kNm) My (kNm) Mz (kNm) Fz (as printed: kNm) h (mm) f break-away (kN)
SPS40E / V3-9 20 11,9 11,4 3,3 2,2 14,7 400 48
25 13,0 12,3 3,3 2,2 14,7
SPS40E / V4-8 20 12,4 11,2 4,0 2,2 17,2 400 61
30 16,6 13,1 4,0 2,2 24,0
35 19,7 17,5 4,2 2,2 26,7
SPS50E / V4-12 20 16,1 15,6 4,9 2,2 19,6 450 83
30 22,4 21,7 4,9 2,2 27,3
35 23,2 23,1 5,2 2,2 29,4
SPS50E / V4-8HS 20 12,4 11,2 4,0 2,2 17,2 400 61
30 16,6 13,1 4,0 2,2 24,0
35 19,7 17,5 4,2 2,2 26,7
40 22,8 21,9 4,4 2,2 29,4
SPS60E / V3-14 20 22,6 21,2 6,1 3,7 21,0 500 90
25 24,4 23,5 6,1 3,7 21,0
SPS60E / V4-15 20 27,0 25,4 8,4 3,7 25,9 500 109
30 28,2 27,7 8,4 3,7 30,6
35 32,0 32,4 9,6 3,7 36,1
SPS60E / V4-12HS 20 19,8 19,3 6,7 3,7 23,5 450 83
30 27,1 26,3 6,7 3,7 32,9
35 29,8 28,9 6,7 3,7 36,4
40 32,4 31,5 6,8 3,7 39,9

h = hull distance to impact; f = break-away impact force. Values are to be considered individually.

Hull Cut-Out & Actuator Installation

Item SPS40E SPS50E SPS60E SPS70E
Through hole 352 ± 4 mm 373 ± 4 mm 422 ± 4 mm 472 ± 4 mm
Hull thickness min. / target / max. (sealant included) 45 / 50 / 52 mm 50 / 55 / 57 mm 55 / 60 / 62 mm 74 / 80 / 82 mm
Hull plate external / internal Ø 455 / 360 mm 475.5 / 380.5 mm 545 / 431 mm 620 / 480 mm
Bolt hole pitch circle Ø 400 mm 425 mm 504 mm 554 mm
Hull plate hole / hole drilled in hull 19.5 / 21 mm 19.5 / 21 mm 26 / 25 mm 26 / 25 mm
Injection port chamfer 90° / 19.5mm 90° / 19.5mm 90° / 26mm 90° / 26mm
Hull plate bolts: stage 1 / stage 2 30Nm / 130Nm 30Nm / 130Nm 30Nm / 160Nm 30Nm / 160Nm

Minimum thickness ensures the seal between hull and actuator; maximum avoids sealant between fin hub and actuator.

  1. Drill a pilot hole on the shaft centre line from outside, cut the hole from inside with a jig, and make the surrounding hull flat and parallel to the target thickness.
  2. Use the external hull plate as template: pilot holes from inside, final holes from outside; countersink all holes and chamfer the hull under the 4 filler injection ports.
  3. Steps 9-17 must be completed within the cure time of the sealant. Seal the mating surfaces (not the inner chamfers) and lower the actuator (approx 300kg possible) with lifting slings and mechanical support.
  4. At least one of the four oil drainage holes at the lowest point; keep the condensation drain holes (directly above them) free of sealant.
  5. Centre the shaft core in the hole (wedges, never hammered) with the injection ports clear over the chamfer.
  6. Seal and fit the hull plate and bolts; grease the nut threads and tighten in the numbered diagonal order in two stages.
  7. Seal the lower gap with EPDM cord pushed 25mm past the red polyurethane ring, then fill the lower void with polyurethane sealant – none in the gap between the polyurethane ring and the external seal plate.
  8. Once cured, inject filler compound (Chock Fast Orange PR610TCF, Steel Blue, Epocast 36 or Locktite PC7202) from the lowest port until it flows clean from the top one (about 500mm of hose on the upper port), then fit blind plugs. Remove leftover compound from the boat (exothermic fire risk).

Antifoul the actuator surfaces with the hull, but mask the openings into the actuator and the fin installation surface.

Electrical Installation

Actuator Supply Peak current Max average current Recommended wire Fuse (slow blow)
SPS40E / SPS50E +24V 150A 70A 25mm2 / AWG 4 100A
SPS40E / SPS50E +48V 75A 35A 16mm2 / AWG 6 50A
SPS60E +24V 190A 150A 50mm2 / AWG 1 175A
SPS60E +48V 95A 75A 50mm2 / AWG 1 100A
SPS70E +48V 155A 120A 50mm2 / AWG-1 150A

Per actuator; cable sizes are indicative and remain the installer's responsibility. Time at anchor is limited by battery capacity.

  • Ground each actuator to the main bonding/anode system at both points with M6x10 bolts.
  • Power connectors come as a kit: strip 18 +/-1 mm, fit end nut and sleeve (plus barrel for 16mm2), crimp with a hexagonal tool, tighten the end nut.
  • SCU: stable surface perpendicular to the keel, as central as possible (e.g. engine room bulkhead), connectors down, 200mm cable clearance. 24V DC with a 15A fuse on X1 (a dedicated switch is recommended); S-Link spur on X2; starboard actuator on X5, port on X6.
  • SCU-actuator cables: 151370-040 (4m), -070 (7m), -100 (10m), -150 (15m), -200 (20m), -250 (25m), -300 (30m); port and starboard lengths may differ.
  • GPS speed data is required, through the GW-1 gateway (NMEA 0183 or NMEA 2000). Fins must centre in reverse: choose the SCU kit for NMEA 2000 transmission PGN127493 (SCU-KIT-2F-NMEA), Twin Disk or ZF pressure switches in series on X3 (SCU-KIT-2F-TD / -ZF; open switch = reverse) or the reversing solenoid interface for 24V solenoid signals (SCU-KIT-2F-SO).
Part no. Description
TP-43A Stabilizer control panel (in all SCU kits) Ask us to source it →
SDI-1 S-Link Display Interface (optional, for MFDs) Ask us to source it →
GW-1 S-Link gateway (in all SCU kits) Ask us to source it →
321714 GPS receiver for S-Link Gateway, NMEA 0183, cable 9m Ask us to source it →
SCU-12 SCU 2-fin Ask us to source it →
SCU-14 SCU 4-fin Ask us to source it →
151371-025 SCU power cable 2.5m Ask us to source it →
151375-100 SCU reverse detection cable 10m Ask us to source it →
151380 Reversing solenoid interface w/dual relays Ask us to source it →
321270 Pressure switch 1/4" 0.1-1 bar NC (ZF kit) Ask us to source it →
321272 Pressure switch 1/4" 1-10 bar NC (Twin Disk kit) Ask us to source it →
6 1320-0,2M S-Link backbone control cable 0,2m View part →
6 1320-2M S-Link backbone control cable 2m View part →
6 1320-4M S-Link backbone control cable 4m View part →
6 1320-7M S-Link backbone control cable 7m View part →
6 1320-10M S-Link backbone control cable 10m View part →
6 1320-15M S-Link backbone control cable 15m View part →
6 1320-20M S-Link backbone control cable 20m View part →
6 1321-0,4M S-Link spur control cable 0,4m View part →
6 1321-1M S-Link spur control cable 1m View part →
6 1321-3M S-Link spur control cable 3m View part →
6 1321-5M S-Link spur control cable 5m View part →
6 1328 S-Link spur power cable 2,5m View part →
6 1322 S-Link backbone extender View part →
6 1326 S-Link T-connector View part →
6 1403 S-Link 4-Port T-connector Ask us to source it →
6 1327 S-Link terminator View part →

Keel Alignment, Fin Fitting & Set-Up

  • Keel alignment is done once, on shore, before the fins go on (repeat only after an encoder replacement). Clamp a straightedge to the alignment tool on the fin hub, then in the panel (PIN 1234 standard): Setup → Fin installation → select actuator and fin type → Start motor self tuning → adjust with the arrows until the straightedge is parallel to the keel → Confirm keel center. Keep clear: the tool may rotate.
  • Fit the fin: align tongue and groove, locking washer on each of the 10 bolts, lubricant (Tef-Gel, lithium grease or Loctite 771) on the upper bolt threads only – none in the holes or on the plate – then torque in the numbered order in two stages.
  • Shaft covers: threadlock (e.g. Loctite 243) on the setscrews; the two covers are handed.
  • Zero inclination: with the boat level automatically, or enter a manual offset (heel to port positive, to starboard negative).
  • Dynamic centering at sea in flat water: float the fins and capture speed and fin position at five increasing speeds (1/5 near idle to top speed), including speeds below and above planing; use trim tabs/interceptors as normal.
  • Set Backing detection and SCU mount direction in Settings → Handling; other parameters are generic defaults (Sleipner can supply hull-specific values). Fit the fin location labels on the hull.
Item SPS40E SPS50E SPS60E SPS70E
Fin bolts stage 1 / stage 2 20Nm / 65Nm 20Nm / 65Nm 30Nm / 300Nm 30Nm / 300Nm
Alignment tool distance "L" 600 mm 800 mm 800 mm 1200 mm
Alignment tool part no. SM200125 SM200179 SM196426 SM200188

Checklist: update TP-43A, SCU and all S-Link devices to the latest firmware at first power-up; check actuator cable polarity, fuses, ground wires, SCU orientation and X5/X6 cables; S-Link power on the same fuse as the rest of the system.

Need a part that isn't listed? Ask us to source it and quote the part number from the PDF.