Deck installation, AC control boxes and breakers, hydraulic pressures, flows and hoses, warping, servicing and the deck unit parts list for the Lewmar C10 and C12 capstans.
Plan the rope lead, the space below deck for the electric or hydraulic motor/gearbox and the cable runs, and check the handle can turn the drum through 360 degrees.
Drill and cut to the template. Seal exposed core on sandwich decks.
Maximum deck thickness 60 mm. Use mounting pads above and below deck if it is not flat; the mounting faces must be parallel.
Remove the drum cap, washer and drum with the handle provided. Use M16 bolts of suitable length (not supplied).
Bed the capstan on sealant (never a permanent adhesive), refit drum, washer and cap.
Below deck: lightly grease the shaft, check the drive key, slide on the motor/gearbox and tighten nuts and washers.
The unit is extremely heavy: use a mechanical lift aid.
AC Electric Version
Wire as per the diagram supplied with the control box; place the box close to the capstan in a dry spot.
Type III stranded tinned copper wire with copper crimp terminals; installation to USCG, ABYC, NMMA or local rules.
The AC motor has an integral electromagnetic brake, pre-wired. With a third-party variable speed control it must be powered separately (contact Lewmar).
Switches in view of the capstan; in multi-station installations all switches wired in parallel. Check the direction from every switch.
Model
Voltage
D.O.L. control box
Breaker*
C10
380/400V AC
68000978
10 A
C10
200/220V AC
68000986
16 A
C12
380/400V AC
68000979
13 A
C12
200/220V AC
68000987
20 A
*Use a 3-pole isolator circuit breaker.
Hydraulic Version
Connect the capstan to a hydraulic powerpack with a directional control valve. The motor/gearbox is a high torque hydraulic motor on an in-line gearbox with brake, and is self sustaining.
Model
Normal pressure
Flow rate
C10 (200 cc/rev)
175 bar 2573 psi
20–55 l/min 5.2–14.3 US gal/min
C12 (250 cc/rev), 13.5:1 gearbox
155 bar 2279 psi
30–80 l/min 7.8–20.8 US gal/min
Hoses & Ports
A and B ports: reinforced braid hose to SAE100R2A or DIN 20 021 Part 2.
Up to 30 l/min: 1/2" (13 mm) bore. Up to 50 l/min: 5/8" (16 mm). Up to 70 l/min: 3/4" (19 mm). Up to 130 l/min: 1" (24 mm).
A & B ports 1/2" BSP; drain port 1/4" BSP.
A drain line is required: minimum bore 10 mm (3/8"), safe working pressure 10 bar, oil compatible semi-rigid plastic tube, braided hose or steel pipe.
Oil
Mineral based, non-foaming, anti-wear, water tolerant, 32 centistokes at 40°C, to ISO32.
Conversions as printed: 3.78 litres = 1 US gallon, 4.54 litres = 1 Imperial gallon.
Warping
Lay three turns of the warp clockwise on the drum; stand where you can work the deck switch while tailing the warp behind you.
Put light, even tension on the tail before switching on. For very heavy pulls, use short bursts of about 10 seconds.
Do not overload or stall the capstan. If it stalls, switch off and wait a few seconds; a tripped breaker/isolator must be reset by hand.
Make the rope fast on an independent strong point (cleat), never on the capstan. Do not wrap chain round it; it is for mooring lines only and is not designed for storm anchoring loads.
Isolate at the breaker after use. The motor gearbox stays hot after running: do not touch it.
Servicing
Regularly
Wash down with fresh water.
Check electrical connections for corrosion; clean and lightly grease.
Check mounting bolts and nuts for tightness and condition.
Annually
Check cables for damage; repair or renew.
Strip the above deck parts, clean and lightly grease.
Inspect the motor/gearbox and repaint when needed.